![]() |
International Society of Science and Applied Technologies |
| Traceability Problems in Preventive Maintenance Policies | ||||
| Author | Xufeng Zhao
|
|||
| Co-Author(s) | Hongshuang Feng; Mingchih Chen; Toshio Nakagawa
|
|||
| Abstract | Planing traceable policies to identify the failures is necessary for a complex system when a failure occurs with accumulated hidden failures. We give three cases of traceability problems in preventive maintenance policies: (a) the cause of failure is traced from the rst failure time t until time t + T if it has not been identied at time t + T; (b) The cause of failure is traced from failure K at time tK for an upper limit time T; (c) The distribution of tracing time depends on the time tK at the Kth failure. We obtain the expected tracing models for preventive replacement policies and nd optimum tracing time T analytically.
|
|||
| Keywords | Tracebility, replacement, minimal repair, downtime cost, reliability | |||
| Article #: RQD26-166 | ||||
Proceedings of 26th ISSAT International Conference on Reliability & Quality in Design |